1st SOLAR POWERED TEMPLE




1st SOLAR POWERED TEMPLE ( Ldg Sungai Salak) 100 year’s old temple requires electricity supply. TNB was not being able to assist as the cost is too high to lay the cable from the main supply. A request was made for a generator or a solar panel to supply electricity.



KSR Engineering, and MyNadi solved the issue by installing 1 unit of 175W PV solar panel, with an inverter that convert direct current (DC) to Alternating current to 6 units of 18watts CFL lights in the temple